Skip to main content
  • Berkeley Lab(link is external)
  • Energy Technologies Area(link is external)
Home
  • Join
  • About +
    • FAQs
    • Team Members
    • Partners
    • Participants
  • Resources +
    • Guidance Documents
    • Case Studies
    • Webinars
    • External Resources

Error message

There was a problem getting your available contact lists.

Costs to Automate Demand Response – Taxonomy and Results from Field Studies and Programs

Publication Type

Report

Date Published

11/2015

Authors

Piette, Mary Ann, Oren Schetrit, Sila Kiliccote, H.Y. Iris Cheung, Becky Zilu LI

Abstract

During the past decade, the technology to automate demand response (DR) in buildings and industrial facilities has advanced significantly. Automation allows rapid, repeatable, reliable operation. This study focuses on costs for DR automation in commercial buildings with some discussion on residential buildings and industrial facilities. DR automation technology relies on numerous components, including communication systems, hardware and software gateways, standards-based messaging protocols, controls and integration platforms, and measurement and telemetry systems. This report compares cost data from several DR automation programs and pilot projects, evaluates trends in the cost per unit of DR and kilowatts (kW) available from automated systems, and applies a standard naming convention and classification or taxonomy for system elements.

Median costs for the 56 installed automated DR systems studied here are about $200/kW. The deviation around this median is large with costs in some cases being an order of magnitude great or less than the median. This wide range is a result of variations in system age, size of load reduction, sophistication, and type of equipment included in cost analysis.

The costs to automate fast DR systems for ancillary services are not fully analyzed in this report because additional research is needed to determine the total cost to install, operate, and maintain these systems. However, recent research suggests that they could be developed at costs similar to those of existing hot-summer DR automation systems. This report considers installation and configuration costs and does include the costs of owning and operating DR automation systems. Future analysis of the latter costs should include the costs to the building or facility manager costs as well as utility or third party program manager cost.

Year of Publication

2015

Organization

Demand Response Research Center (DRRC), Grid Integration Group, Energy Storage and Distributed Resources Division

Research Areas

BTUS Demand Response and The Grid, Demand Response Research

Related Files

PDF (1.28 MB) (link is external)

        

©2025 Energy Technologies Area, Berkeley Lab
Lawrence Berkeley National Laboratory (link is external)
  • twitter(link is external)
  • instagram(link is external)
  • LinkedIn(link is external)
  • facebook(link is external)
  • youtube(link is external)
  • DOE logo
  • UC logo
A U.S. Department of Energy National Laboratory Managed by the University of California
Questions & Comments(link is external) Privacy & Security Notice(link is external)